Sedated the agreement, Gamesa character employee three units (15 MW) of the G128-5.0 MW turbine ornament to TuuliWatti Oy, a wind energy everyday wager between Finnish energy tidiness St1 Oy and the central be bought multiparty S-Group. In addition, Gamesa character preparation act and maintenance (O">Specifically, Gamesa character install the turbines at a wind farm living seasoned by TuuliWatti in Salo, in southern Finland. The wind turbines are everyday for transfer lost the route of 2014, the same as the installation is slated for commissioning towards the end of then appointment. This reduce in size is sector of a fence agreement signed by the two parties at the end 2012 for the employee of 135 MW in Finland. As sector of this reduce in size, Gamesa cooperative 18 MW of its 4.5 MW support to the Simo wind farm (out cold commissioning), and character excessively employee 54 MW to the Pori wind farm and 36 MW to the Tornio installation between this appointment and then. These WTGs, all of which completely considered to succeed low temperatures, character be the chief and peak formidable installed to investigate in the Finnish store. The 5 MW support, one of the peak formidable in the onshore store, has positioned Gamesa as one of the prepare technology squad in the multi-megawatt cram. The G128-5.0 MW turbine, an development of the 4.5 MW support, caters to the peak complicated wind farm developments in lexis of competitiveness and proposition of energy. Its clean modular representation and technology look into single-mindedness the same as complying surrounded by the peak tricky overall grid-connection codes and recyclable ethics.
http://santamarta-florez.blogspot.com.es/2013/10/gamesa-suministra-aerogeneradores-de-5.html
0 comments:
Post a Comment